built upor built-up

Construction, panel, and floor covering adhesive means any one-component adhesive that is designed exclusively for the installation, remodeling, maintenance, or repair of:

Built UpCompany

Set-up means the preparation, cleaning, and maintenance of personal effects, supplies, assistive devices, or equipment so that an individual may perform an activity.

The Built up area shall be measured only after addition and alteration work carried out by the landlord as per banks approved layout plan for the Branch.

Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.

Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

Loader means any type of off-road tractor with either tracks or rubber tires that uses a bucket on the end of movable arms to lift and move material; can be also referred to as a front-end loader, front loader, skid steer loader, backhoe, rubber- tired loader, or wheeled loader.

Mode of measurement of premises is as follows: Rental will be paid on the basis of Built up area basis, which could be measured jointly by the Bank and Landlord.

Built-up area

Substation means the apparatus that connects the electrical collection system of the WECS(s) and increases the voltage for connection with the utility's transmission lines.

Built Upconstruction

Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:

Built-up area meaning

Metal clad, cubicle, indoor, free standing type suitable for Mounting on Built up Trenches with U Channels of adequate size.

Mode of measurement for premises is as follows: Mode of measurement of Built up area will be in accordance with the Indian Standard mode of measurements.

The Milton S-1806 Male National Pipe Thread (MNPT) P Style Coupler is designed for high-performance and durability in pneumatic applications. Featuring a 3/8" ...

Federated Tool Supply © All rights reserved. All prices listed on this website are in Canadian dollars (CAD) and all charges will be processed in Canadian dollars (CAD).

As-built drawings, as used in this clause, means drawings submitted by the Contractor or subcontractor at any tier to show the construction of a particular structure or work as actually completed under the contract. “As-built drawings” shall be synonymous with “Record

New Building ’ means a new construction to house a complete motor vehicle as- sembly process, where that construction includes the pouring or construction of a new foundation and floor, the erection of a new frame and roof, and the instal- lation of new plumbing and electrical and other utilities;

Built upmeaning

HSMAdvisor has a built in MRR calculator. It adjusts on the fly whenever you alter cut parameters, so it's a good and quick way to tweak your parameters to ...

Listen to the Edge of Valor audiobook by Kyla Stone, narrated by Stacey Glemboski. From USA Today best-selling author Kyla Stone comes the epic finale to ...

Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.

The Bank will take the premises on the basis of carpet area, which means that the usable area inside the outer walls will be measured and not on the basis of Plinth Area / Built up area / Super Built Up Area.

Cold Weather Alert means the notice that PJM provides to PJM Members, Transmission Owners, resource owners and operators, customers, and regulators to prepare personnel and facilities for expected extreme cold weather conditions.

Access Tandem Switch is a Switch used to connect End Office Switches to interexchange Carrier Switches. Qwest's Access Tandem Switches are also used to connect and switch traffic between and among Central Office Switches within the same LATA and may be used for the exchange of local traffic.

Construction management at-risk means a project delivery method in which the District awards separate contracts, one for architectural and engineering services to design an infrastructure facility and the second to a construction manager at-risk for both construction of the infrastructure facility according to the design and construction management services.

DYMOND, DALE MILLS Freeland, MI Beloved husband, brother and uncle passed away April 7, 2019 at St. Mary's Ascension Hospital after a valiant fight with ...

Built upsynonyms

Suburb, Locality, Postcode. 6 de Noviembre Ocotlán, 47880. Camino Real Ocotlán, 47849. El Carmen Ocotlán, 47892. El Duque Ocotlán, 47862. El Mezquite

Techniks CNC Tool Holders ... Techniks Certified Tool Holders deliver excellent performance in a wide range of machining applications including milling, drilling, ...

Built upin a sentence

Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.

Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.

Jun 15, 2024 — Drilling through hardened steel demands precision and durability, qualities that not all drill bits possess. For professionals and DIY ...

iMachining 3D automatically produces a complete, ready to run CNC program, with optimal Cutting conditions achieved by the expert knowledge-based Technology ...

Engine degreaser means a cleaning product designed to remove grease, grime, oil and other contaminants from the external surfaces of engines and other mechanical parts.

Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

Start-up means the time period required to bring the equipment covered under the Contract from an inactive condition, when construction is essentially complete, to the state ready for trial operation. The startup period shall include preliminary inspection and checkout of equipment and supporting sub-system, initial operation of the complete equipment covered under the Contract to obtain necessary pre-trial operation data, perform calibration and corrective action, shut down, inspection and adjustment prior to the trial operation period.

Base station means the station as set out in Part-II (SOQ) hereof where the vehicle(s) / equipment shall be permanently based, (i.e. based for minimum period of 10 (Ten) days at a stretch) which may be changed at the discretion of the Company.

All payments to the landlord shall be made by Account Payee Cheque or RTGS/NEFT.1.14 Mode of measurement for premises is as follows: Mode of measurement of Built up area will be in accordance with the Indian Standard mode of measurements.

May 22, 2019 — DMT (Diamond Machining Technology) Sharpening Products. Posted on May ... cutting edge of the hook tool and a few other turning tools.

These carbide bars are extremely effective in a variety of applications including boring, grooving, threading, profiling and reverse profiling a wide range of ...

Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.